Green Energy Corridor Overview | Ministry of New and Renewable Energy | India (2024)

In year 2012, a study was conducted by Power Grid Corporation of India Limited (PGCIL) wherein it was found that power evacuation and transmission infrastructure in near vicinities of potential sites was less and therefore, dedicated transmission infrastructure for large scale solar and wind power plants was planned. The Green Energy Corridor (GEC) report was submitted by PGCIL in September 2012. Based on PGCIL’s report, the states prepared their own transmission plans & submitted to Central Electricity Authority (CEA) for appraisal. The implementation work started in 2015, after due approval process.

There are two schemes under the Green Energy Corridors:

  1. Intra-State GEC Phase-I
  2. Intra-State GEC Phase-II
Green Energy Corridor Overview | Ministry of New and Renewable Energy | India (2024)
Top Articles
Latest Posts
Article information

Author: Neely Ledner

Last Updated:

Views: 5760

Rating: 4.1 / 5 (42 voted)

Reviews: 81% of readers found this page helpful

Author information

Name: Neely Ledner

Birthday: 1998-06-09

Address: 443 Barrows Terrace, New Jodyberg, CO 57462-5329

Phone: +2433516856029

Job: Central Legal Facilitator

Hobby: Backpacking, Jogging, Magic, Driving, Macrame, Embroidery, Foraging

Introduction: My name is Neely Ledner, I am a bright, determined, beautiful, adventurous, adventurous, spotless, calm person who loves writing and wants to share my knowledge and understanding with you.